Client’s desire to negotiate contract terms.All of these circumstances (but not limited to) can contribute to additional lead times: There are many reasons a tensioned membrane structure project’s timeline may be significantly longer. (2) Weeks to deliver and install frame and fabric membrane.(1) Week to paint frame after its fabrication is complete.(4) Weeks to fabricate frame and fabric membrane after receipt of materials.(2) Weeks to order and receive materials after completion of shop drawings. (2) Weeks for shop drawings after field measurements are surveyed.(2) Weeks for field measurements from time of footing completion.(3) Weeks for stamped engineering report and drawings after completion of engineering analysis.(3) Weeks for engineering analysis and calculations from time of design approval.(3) Weeks for 3D design drawings from time of approved contract terms and receipt of deposit.Here’s a sample of what you could expect from a 22-week timeline for a medium-sized project: Most often, it takes between five and twelve months to complete the project. The time it takes to build a tensioned membrane structure depends upon the material, size, and scope of the project. A Sample Timeline for a Tensioned Membrane Structure
0 Comments
Leave a Reply. |